1200MM PE PP Pipe Extrusion Line
  • 1200MM PE PP Pipe Extrusion Line
  • 1200MM PE PP Pipe Extrusion Line
  • 1200MM PE PP Pipe Extrusion Line
  • 1200MM PE PP Pipe Extrusion Line
  • 1200MM PE PP Pipe Extrusion Line
  • 1200MM PE PP Pipe Extrusion Line
1200mm PE PP pipe production extrusion plant Admin Edit
  • 750000.0 USD
  • MOQ: 1 Set/Sets
  • Trade Term: FOB
  • Payment Terms: L/C, T/T
  • Place of Origin: Jiangsu, China (Mainland)
  • Means of Transport: Ocean
  • Production Capacity: 30 lines per year
Specifications
MOQ: 1 Set/Sets Trade Term: FOB
Payment Terms: L/C, T/T Place of Origin: Jiangsu, China (Mainland)
Means of Transport: Ocean Production Capacity: 30 lines per year
Packing: suitable sea transport package Delivery Date: 50 working days after receive deposit money
Brand Name: BENK pipe range: 710-1200mm
main extruder: SJ150/33 single screw extruder capcaity: MAX 1000-1200KG/H
Main motor: XIMO electric parts: SIEMENS, Shneider, OMRON
Certificate: CE ISO9001 suitable material: PE/PP
pipe function: GAS, water supply, pressure pipe etc. installation size: 50x4x4M
machine color: according to your idea
Product Description

KPM-PE1200MM HDPE/LDPE SINGLE/MULTY LAYER PIPE EXTRUSION LINE

 

We use good quality C model and U model steel as the frame, SIEMENS motor, SIEMENS contactor, OMRON tempertre controller, TTIANYI Button, ABB/FUJI/HOLIP/SHREADER inverter etc. electrical parts.

Choose us, closier to success.

 

HDPE large diameter plastic pipe production lineis mainly used to machining and manufacturing for PE plasric pipe, and HGF series tube auxiliary eqiupments production line can also use to process other plastic. Extruder and GF series tube auxiliary equipments production line take the features of advanced, reliable and applied together, and provide strong certification for high quality plastic tube for customers.

 

technological flow chart:

drying feeding--main extruder andmark color extruder---head mould---vacuum molding---thickness finder(can be choosen by self)----vacuum calibration tank---spray cooling tank---printer--haul-offs---cutter---stacker

 

reference pics:

1, extruder & vacuum forming tank

2, extrusion die

3, vacuum forming tank

4, spray colling tank

5, 10 claws haul-off

6,planetary cutter

 

 

KPM-PE1200MM HDPE-LDPE PIPE EXTRUSION LINE MAIN TECHNICAL PARAMETERS:

EXTRUDER

SJ150/35 SINGLE SCREW EXTRUDER

VACUUM FORMING TANK

8+6M, DOUBLE ROOM+SINGLE ROON

HAUL-OFF

10 or 12 CLAWS

CUTTER

PLANETARY CUTTER

ELECTRICAL PARTS

SIEMENS MOTOR, ABB INVERTER

 

 other model Main technical parameters:

model

KPM-PE63

KPM-PE125

KPM-PE250

KPM-PE630

MAX pipe diameter

63mm

125mm

250mm

630mm

main frame

SJ65/33

Sj75/33

SJ90/33

SJ120/33

total power

60kw

75kw

160kw

260kw

motor type

DC

DC

DC

DC

MAX output

90kg/h

160kg/h

300kg/h

600kg/h

hauling speed

0.5-8m/min

0.3-4m/min

0.2-2m/min

0.1-1m/min

MAX traction

10000N

15000N

30000N

50000N

cutting type

disc type cutter

disc type cutter

disc type cutter

disc type cutter

dimesion

22000X2000

X2000mm

24000X2100

X2100mm

30000X2300

X2300 mm

38000X2500

X2300mm

 

2. After-sales service

2.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.

2.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

2.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of lading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.


We thank you for your inquiry and would be pleased to receive your order soon.

 

ZHANGJIAGANG CITY BENK Machinery Co., Ltd.


WELCOME VISIT OUR FACTORY LOACATED IN ZHANGJIAGANG CITY, JIANGSU CHINA.


Related Links