16-110mm High Speed PE Pipe Extrusion Line With MAX Out Put 350KG
  • 16-110mm high speed PE pipe extrusion line with MAX out put 350KG
  • 16-110mm high speed PE pipe extrusion line with MAX out put 350KG
  • 16-110mm high speed PE pipe extrusion line with MAX out put 350KG
  • 16-110mm high speed PE pipe extrusion line with MAX out put 350KG
  • 16-110mm high speed PE pipe extrusion line with MAX out put 350KG
  • 16-110mm high speed PE pipe extrusion line with MAX out put 350KG
16-110mm high speed PE pipe production line Admin Edit
  • 150000.0 USD
  • MOQ: 1 Set/Sets
  • Trade Term: FOB
  • Payment Terms: L/C, T/T
  • Place of Origin: Jiangsu, China (Mainland)
  • Means of Transport: Ocean
  • Production Capacity: 100 lines per year
Specifications
MOQ: 1 Set/Sets Trade Term: FOB
Payment Terms: L/C, T/T Place of Origin: Jiangsu, China (Mainland)
Means of Transport: Ocean Production Capacity: 100 lines per year
Packing: suitable sea transport package Delivery Date: 50 working days after receive deposit money
Brand Name: BENK pipe range: 16-110mm
main extruder: SJ165/38 single screw extruder capcaity: MAX 350KG/H
Main motor: XIMO electric parts: SIEMENS, Shneider, OMRON
Certificate: CE ISO9001 suitable material: PE/PP
pipe function: GAS, water supply, pressure pipe etc. installation size: 50x4x4M
machine color: according to your idea
Product Description

Benk Machinery China 16-110mm high speed PE pipe extrusion line manufacturer

Benk Machinery China 16-110mm high speed PE pipe production line manufacturer

Product Application of pe pipe extrusion line
High speed HDPE pipe extrusion line is an new product in this filed, it can produce PE pipe double speed than normal line, using SJ65/38 high speed single screw extruder, combined with vacuum forming tank, spray cooling tank, haul-off, cutter and high speed double disc winder making it working high efficency and stable.
 

the production line is KPM company developed a new type of pipe production line for PE , pp and other polyolefin pipe extrusion speed , all models with advanced PLC/PCC modular intelligent control system , in order to realize the whole production line automation and real-time data recording and closed-loop control , the production line has some high yield , wide adaptation of raw materials , suatained and stable production of high quality productions such as columns a bit .


pe pipe extrusion line technological flow chart:

 

drying feeding--main extruder andmark color extruder---head mould---vacuum molding---thickness finder(can be choosen by self)----vacuum calibration tank---spray cooling tank---printer--haul-offs---cutter---stacker

 

Pe pipe extrusion line main technical parameters:

EXTRUDER             

SJ65/38 SINGLE SCREW EXTRUDER

VACUUM FORMING TANK

8+6M, DOUBLE ROOM+SINGLE ROON

HAUL-OFF

2CLAWS

CUTTER                                                      

disc cutter

ELECTRICAL PARTS

OMRON temperature controller, SCHNEIDER, SIEMENS etc.



pe pipe extrusion line models:

Model

Pipe spec(mm)

Conical twin screw extruder

 Max.output

(kg/h)

Total power(kw)

KPM63-PE

Φ20-Φ63

SJ65/38

250-300

75/90

KPM110-PE

Φ63-Φ110

Sj65/38

250-300

90

KPM250-PE

Φ75-Φ250

Sj75/38

500-550

185

KPM450-PE

Φ160-Φ450

SJ90/38

700-750

250

KPM630-PE

Φ315-Φ630

SJ120/38

900-1100

280

KPM800-PE

Φ400-Φ800

SJ150/35

1000-1200

315

KPM1000-PE

Φ630-Φ1000

SJ150/38

1000-1200

315

KPM1200-PE

Φ800-Φ1200

SJ120/33 & SJ90/38

1500-1700

280/220


pictures for pe pipe extrusion line

SJ65/38 single screw extruder used to melting PE raw material

Sj25/25 single screw extruder used for line mark

high speed extrusion mould used to cooling and shaping the pipe into round and control pipe wall thickness

9m length vacuum forming tank used to making pipe round 

9m length spray cooling tank used to cool down PE pipe in high speed

high speed haul-off guarantee the process in stable and supply enough force

cutting machine used to cut the pipe when winder pipe finish

double disc winder used to winding the pipe into roller


 pe pipe extrusion line after-sales service


 Technical documents

 

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.

 

 Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.


Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of lading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.

 

FAQ for pe pipe extrusion line

Q: How about the spare parts?

A: We will send one year enough easy broken spare parts together with the  machine when shiped.

  During the warranty time, we will supply the spare parts with our cost                    including the delivery fees
 

Q: How to install my machines when it arrives? how much the cost?

A: We will send engineers to your factory to install the machines and train your staff how to operate the mahcines.

    Customer pay airtickets go and back, accommodation and USD80/day/Engineer.
 

Q: When can I get m machine after paid?

A: Usually it cost about 30-60 days, the exactly depend on what kind of machine you order. the shipping time is based on your destination port.
 

Q: What is your guarantee or warranty of the quality if we order your machines?

A: We offer high quality machines with 13 month guarantee since B/L issued, and supply life-long technical support.
 

Q: Are you a trading company or manufacture?

A: We are a manufacture, we supply the factory price with high quality, welcome   to visit!


 

 

ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.

Eric

Market Director


Related Links