200KG/h Pvc Pipe Extrusion Manufacturing Process With Pipe OD 50-160MM
  • 200KG/h pvc pipe extrusion manufacturing process with pipe OD 50-160MM
  • 200KG/h pvc pipe extrusion manufacturing process with pipe OD 50-160MM
  • 200KG/h pvc pipe extrusion manufacturing process with pipe OD 50-160MM
  • 200KG/h pvc pipe extrusion manufacturing process with pipe OD 50-160MM
  • 200KG/h pvc pipe extrusion manufacturing process with pipe OD 50-160MM
  • 200KG/h pvc pipe extrusion manufacturing process with pipe OD 50-160MM
pvc pipe extrusion manufacturing process with ABB inverter Admin Edit
  • 45000.0~65000.0 USD
  • MOQ: 1 Set/Sets
  • Trade Term: FOB,CFR,CIF
  • Payment Terms: L/C, T/T
  • Place of Origin: Jiangsu, China (Mainland)
  • Means of Transport: Land, Ocean
  • Production Capacity: 20 sets per month
Specifications
MOQ: 1 Set/Sets Trade Term: FOB,CFR,CIF
Payment Terms: L/C, T/T Place of Origin: Jiangsu, China (Mainland)
Means of Transport: Land, Ocean Production Capacity: 20 sets per month
Packing: suitable sea transport package Delivery Date: 35 working days after deposit money received
Brand Name: BENK pipe range: 75-200mm
material: PVC pipe functiom: water supply
extruder: SJZ65/132 conical double screw capacity: MAX 200KG/H
Inverter: ABB Main motor: SIEMENS AC motor
installation power: 83Kw instalaltion area: 24X2X2.6m
color: aaccording to your requirements
Product Description

200KG/h pvc pipe extrusion manufacturing process with pipe OD 50-160MM


This PVC pipe production line is widely used for producing PVC water supply pipe, drainage pipe and high voltage cable protection pipe. With CPVC pipe mold, it could also produce CPVC pipe. It is consist of SJSZ series extruder, mold, vacuum tank,spraying cooling tank, haul-off,cutting machine, stacker, and can produce PVC pipe from mixed powder directly.
The production line uses special designed screw and mould, which makes it easy forming, even plasticization, high capacity stable running and easy operation


pvc pipe extrusion manufactruing process manufacture technical parameters

ExtruderSJSZ51/105SJSZ65/132SJSZ80/156SJSZ92/188
Max. Diameter( MM )Φ75Φ200Φ315Φ630
Motor power (KW)18.5375590
Drawing machine (M/Min)0.5-100.5-80.5-60.5-4
Total length(M)20252832
Output ( Kg/H )80-120180-250280-350500-600


more  reference pictures of pvc pipe extrusion manufacturing process manufacture:

BENK Machinery China pvc pipe manufacturing process manufactureBENK Machinery China pvc pipe manufacturing process manufactureBENK Machinery China pvc pipe manufacturing process manufactureBENK Machinery China pvc pipe manufacturing process manufacture


2. pvc pipe extrusion manufcturing processing manufacture after-sales service

2.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.

2.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

2.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of lading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.

 

We thank you for your inquiry and would be pleased to receive your order soon.

 

ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.


Related Links